Focus follows the action.
Automatic zoom guides the viewer to your clicks, then eases back to the bigger picture.
From everyday walkthrough to something worth watching. Smooth zoom, a clear cursor, and your camera in just the right place.
For Mac. Apple Silicon. macOS 15.2 or later.
Hover a button. Try a background.
Here’s what a finished recording looks like.


Sample presenter video. Adjust the camera appearance in the settings.
The camera is recorded separately; its appearance can be changed later.
After the intro, the camera moves smoothly to your chosen corner.
Automatic zoom guides the viewer to your clicks, then eases back to the bigger picture.
Smooth the cursor, add motion blur, and choose the background, spacing, and shadow.
Your camera sits in its own adjustable frame and changes size as the screen zooms.
Two plans. Your recordings stay on your Mac.
For quick walkthroughs and everyday sharing.
No subscription required.
Includes Coast, Mist and Graphite, plus the option to record without a background.
More detail. Your camera. Your own look.
$35.88 billed yearly. USD
Downloads and Pro subscriptions are preparing for launch.